Digital Front Desk Try it free

Free templates · Industrial sites

Free template · no sign-up

Contractor orientation checklist

A good-practice checklist for the orientation a contractor gets before starting work, with a note on each topic and a sign-off.

For Sites that orient contractors before work starts

First page of the contractor orientation checklist

What it is for

An orientation is easy to rush on a busy morning. Working through a checklist and signing it off means every contractor hears the same topics, and the site keeps a record that they did. This is a good-practice checklist, not a complete list of legal requirements: add any provincial or OSHA requirements that apply to your site and your work.

Who it is for

The host or safety lead who meets contractors at a single-site plant or warehouse, and the contractor's own supervisor.

How to use it

Add your site's own rules, go through each topic with the contractor before work starts, and both sign at the bottom.

  1. Edit the Word or spreadsheet version to add your site's own rules and any requirements that apply to you.
  2. Go through each topic with the contractor before work starts, and tick it off.
  3. Both of you sign at the bottom. Keep the signed copy with the day's sign-in sheet.

The checklist

Contractor orientation checklist Site: ____________ Date: ____________

Contractor: ____________________ Company: ____________________ Work area: ____________________

DoneTopicWhat to cover
☐Site rulesHours, sign-in and sign-out, where contractors may and may not go, smoking, phones and vehicles.
☐Hazards in the work areaThe specific hazards where they will work: moving equipment, forklifts, chemicals, noise, heights, hot work.
☐PPEWhat is required in the work area, what the contractor brings and what the site provides.
☐Emergency exits and muster pointThe nearest exits, the alarm sound, the muster point, and that they must report there to be accounted for.
☐First aidWhere the first aid kit is and who the first aiders are.
☐Reporting incidents and near missesWho to tell, how fast, and that near misses are reported too.
☐Lockout and permits, if applicableLockout, hot work, confined space or other permits the job needs, and who issues them.
☐Who to contactThe host, the safety contact and the after-hours number.
☐Site-specific additionsAny provincial or OSHA requirements that apply to your site.

Contractor signature: ______________________ Date: __________

Orientation given by: ______________________ Date: __________

Moving off paper? See how the Digital Front Desk visitor management system signs visitors in on your own tablet, with its prices in Canadian dollars.

More templates for industrial sites

All 8 free templates
First page of the contractor sign-in sheet

Contractor sign-in sheet

A sign-in sheet for contractors arriving at a plant or warehouse.

First page of the industrial visitor log

Industrial visitor log

A visitor log for a single-site plant or warehouse.

First page of the fire evacuation roll-call sheet

Fire evacuation roll-call sheet

A roll-call sheet for the assembly point after an evacuation.

The Digital Front Desk check-in screen on a tablet, welcoming a visitor to Northside Family Clinic, with a Start check-in button