Evacuation roll-call sheet
A roll-call sheet for the assembly point after an evacuation.
Not legal advice. Last checked 7 October 2026 against OSHA 29 CFR 1910.38(c).
Free template
A roll-call sheet for each muster point after an evacuation, with a section for the contractors and visitors on the sign-in list.
A roll-call sheet for the assembly point after an evacuation.
Not legal advice. Last checked 7 October 2026 against OSHA 29 CFR 1910.38(c).
In the United States, where an OSHA standard requires an emergency action plan, OSHA's emergency action plan rule lists among the minimum elements of that plan:
"Procedures to account for all employees after evacuation;" OSHA 29 CFR 1910.38(c)(4), osha.gov
This sheet is a tool for carrying out that kind of procedure at a muster point. It supports your site's emergency action plan; it does not replace it, and it does not decide who should be on the list. In Canada, check your province's requirements for emergency procedures.
Fire and floor wardens, shift supervisors and the safety lead at a single-site plant or warehouse.
Evacuation roll call Date: ________ Time of alarm: ________
Muster point: ____________________ Warden name: ____________________
| Name to account for | Accounted (yes / no) | Notes |
|---|---|---|
Contractors and visitors from the sign-in list
| Name | Company or organization | Host | Accounted (yes / no) | Notes |
|---|---|---|---|---|
Time all accounted for: __________ Warden signature: ______________________